
English technical overview. The complete supplied article is available in Persian using the language switch.
Overview
Plan switching capacity, routing and power alongside resilience and operations.
Design considerations
Switches connect local endpoints while routers connect networks. VLANs provide logical separation; inter-network policies determine permitted traffic. Capacity planning should consider uplinks, traffic patterns and growth.
Operational practice
A PoE budget must cover each powered device and the total switch limit. Consider redundancy, monitoring, configuration backups and documentation. Validate performance against the intended workload.


